Monthly Archives: March 2020

New Depot Building (the story so far)

Foundations

Foundations excavated.

Depot framework
                                                                                                                                     The steel structure is erected.

Depot blockwork

Block walls built.

Depot roof fix
                                                                                                                                      Preparing for the roof installation.

Depot lighting

Lighting installed.

Depot floor levelling
                                                                                                                                     Groundwork floor levelling.

Depot door girder

Steelwork installed for the roller doors.

Depot floor grid
                                                                                                                                      Steel mesh for the concrete floor.

Depot floor concrete

Concrete floor laid.